Capacity:The system can plot 10 moving vehicles per second with 10 mm precission. Up to 0,5 m/s speed.
Tunnels and shadow areas:The systemet works like any GPS. At large hidden areas like a shadow station or a shadow shunting area you can insert an extra pair of receivers. In tunnels the systems works like any GPS, knowing the speed and the track the uncertainty will be compensated with a calculation based on other train data like speed.
Opmerking van Pauw is uit 2018.Die zelf voor het laatst in 2019 actief was.. Mvg Rieks.