Doel:€250.00
Donaties:€88.00

Per saldo:€-162.00

Steun ons nu!

Laatst bijgewerkt
op 03-06-2025

Vacature: secretaris bestuur
Algemeen

De stichting

Recente berichten

Wie heeft er ervaring met een baan in een inpandige garage in een app. gebouw? door peterha
Vandaag om 19:27:46
Toon hier je (model)TRAM foto's. door Hans Reints
Vandaag om 19:26:41
Wèhnich - Eén onbeduidend baantje op 1200 bij 1200mm door Robert vh Prutsert
Vandaag om 18:32:48
13 en 14 september Pairi Daiza Steam Railway 10 jaar door GD
Vandaag om 18:14:51
Toon hier je nieuwe (model-) spooraanwinst(en)... door ceuleer
Vandaag om 17:50:25
Minstens 5 jaar geen treinverkeer Groningen-Leer [D] door saskia
Vandaag om 17:48:47
Veevervoer ss/ ns door Rob Ellerman
Vandaag om 17:19:13
Toon hier je pas gereed gekomen (model-)spoorbouwsels ... door Rob Ellerman
Vandaag om 17:17:46
De modeltreinen van Spoorijzer door Mispoes
Vandaag om 17:15:34
Onlangs gespot - gefotografeerd, de foto's door Huup
Vandaag om 16:42:14
Vraag Lima DDM 149868 handleiding door henk
Vandaag om 16:26:56
Welke winkel voert deze merken? door Wim1969
Vandaag om 15:51:58
Mijn-bouw Indonesie door NS264
Vandaag om 14:45:14
44 Roco vs 44 Brawa door Nico Hoogerwerf
Vandaag om 13:47:07
Am Ende der Strecke, modulebaan op 1 M2 door Eric B
Vandaag om 13:23:27
Mallnitzer Tauernbahnstrecke ÖBB N Spoor door william_2
Vandaag om 12:21:52
Swalbenburg, N modulebaan door NS264
Vandaag om 11:37:38
BNLS-Module: "Rvbr-Btk, Ringvaartbrug Haarlemmermeer nabij Buitenkaag" NS H0 door nighttrain1
Vandaag om 11:33:42
Mijn eerste H0-modeltreinbaan in aanbouw door MichielB
Vandaag om 10:17:55
Nederland jaren 50 op basis van mijn roots door Simplex
Vandaag om 10:01:07
Minder wissels door Eric B
Vandaag om 09:41:54
Ombouw/Pimpen Bolle neuzen door bollen neus
Vandaag om 08:41:57
Plaatdikte van een rangeerbaan door ruudns
Vandaag om 08:23:41
De bouw van mijn modelbaan in Thailand door Thai-Bundesbahn
Vandaag om 06:18:08
6 en 7 september terug naar toen door Wim Vink
06 September 2025, 23:34:38
Alweer is de Weller soldeerbout defect door Peter Kleton
06 September 2025, 23:05:54
Raadplaatje door Modellbahnwagen
06 September 2025, 21:50:45
Spooraccessoires in diverse schalen, 3D-geprint. door Huup
06 September 2025, 20:12:59
Deining in Dönsdorf door Basilicum
06 September 2025, 19:19:21
Treinsamenstelling vooroorlogse D treinen door Martijnstein
06 September 2025, 17:56:43
  

Auteur Topic: Mail by Rail  (gelezen 1143 keer)

Hans Reints

  • हार्दिक शुभ कामनाएँ مع أطيب التحيات
  • Online Online
  • Berichten: 12480
    • sleutelspoor
Mail by Rail
« Gepost op: 17 August 2011, 16:40:44 »
Dit wilde ik jullie toch niet onthouden,


From 1832 to 1967, railroads large and small kept mail moving through rain, snow and gloom of night. As America grew and expanded, so did the Railway Mail Service, an elite branch of the Post Office Department that oversaw every aspect of moving mail by train. Nowhere was this more crucial than in the western states, where it could take months to receive a letter from back east. As stage lines and the pony express gave way to the railroads, mail service became an important part of every passenger train. At the dawn of the 20th century, railroads began offering faster and finer trains, aimed at affluent travelers. Their fast schedules and limited stops made them an ideal way to speed mail, and a Railway Post Office (RPO) became a fixture of each consist. This continued into the streamline era, and from the beginning, Santa Fe's premiere Super Chief and El Capitan included a Railway Post Office car.
Owing to the volume of mail received, sorted and distributed between Chicago and Los Angeles, the Post Office assigned the biggest RPOs to the route, equipped with a 60' mail compartment. Since the full interior was only used for sorting mail, these were known as “full RPOs.”
Despite increasing competition from air and highway, in 1954 Santa Fe took delivery of 10 brand-new full RPOs from Budd. Built of gleaming stainless steel, cars #89-98 allowed the railroad to create a pool of RPOs especially for its streamliners, instead of assigning specific cars to each.
While the Super Chief carried an RPO in both directions, after 1956 the new Hi-Level El Capitan only handled an RPO on its eastbound trip (since most of the population and industry were still in the east, more mail moved eastward) and only for part of its run. A car was picked up at La Junta, Colorado, and forwarded to Kansas City. This was switched out and a new RPO added for the final leg of the trip to Chicago.
Not all of the mail carried on these important runs had to be sorted en route, so both trains routinely carried at least one baggage car in storage mail service. This was actually mail traveling in locked pouches for a single destination and bulk mail such as magazines, which would all be sorted for local delivery after arrival.
With the loss of railway mail contracts in 1967, Santa Fe sidelined all of the 89-class RPOs in 1968. Most were sold to Mexico, and worked there for several more years. 
For modelers who want to make their train as authentic as possible, Walthers new El Capitan includes a 63' Railway Post Office (#932-9730). Based on cars #89-98, built by Budd as Job #9607-135, the models feature a real metal finish to simulate the prototypes' stainless steel construction, clear “glass” (tinted glass was reserved for passengers) factory installed grab irons and much more. Matching 73' Baggage Cars (#932-9740) are also available separately to handle bulk mail too

bron:Walthers
Dit forum is net een lopend buffet, je neemt wat je lekker vindt en wat je niet lust laat je liggen.