Doel:€250.00
Donaties:€88.00

Per saldo:€-162.00

Steun ons nu!

Laatst bijgewerkt
op 03-06-2025

Vacature: secretaris bestuur
Algemeen

De stichting

Recente berichten

Modelspoorbaan van Einte door william_2
Vandaag om 19:08:07
Koppelingsmechanisme klemt? door grossraumwagen
Vandaag om 19:03:10
Mallnitzer Tauernbahnstrecke ÖBB N Spoor door william_2
Vandaag om 19:01:41
Veevervoer ss/ ns door Rob Ellerman
Vandaag om 18:33:30
De IJmuider spoorlijn - korte geschiedenis en plaatjes door IJmc
Vandaag om 18:27:33
Am Ende der Strecke, modulebaan op 1 M2 door Frank 123
Vandaag om 18:14:16
Au bord de la Cèze door Chris80
Vandaag om 17:59:51
Mijn-bouw Indonesie door MOVisser
Vandaag om 17:53:05
Hoe de schuifdeuren weer te plaatsen? door Robert vh Prutsert
Vandaag om 17:25:36
Ombouw/Pimpen Bolle neuzen door aad52
Vandaag om 16:52:47
Baanbouw Rehausen2 door Wim Vink
Vandaag om 16:23:17
De modeltreinen van Spoorijzer door spoorijzer
Vandaag om 14:27:52
Van British Railways Class 58 naar ACTS 5814 in 0 door Jeroen95
Vandaag om 14:19:22
Nieuw boek, BE in de tijd van het derde rijk door Arjan6511
Vandaag om 13:25:51
Welke winkel voert deze merken? door Rondje_HO
Vandaag om 12:37:22
Nederland jaren 50 op basis van mijn roots door defender
Vandaag om 12:12:26
Mijn eerste H0-modeltreinbaan in aanbouw door Jelmer
Vandaag om 11:35:53
Minstens 5 jaar geen treinverkeer Groningen-Leer [D] door Eric B
Vandaag om 10:11:11
BNLS modulebaan: Werkspoor-Kathedraal 3.0 door MOVisser
Vandaag om 09:54:12
BNLS-Module: "Rvbr-Btk, Ringvaartbrug Haarlemmermeer nabij Buitenkaag" NS H0 door MOVisser
Vandaag om 09:10:43
44 Roco vs 44 Brawa door FransW
Vandaag om 07:59:36
Toon hier je nieuwe (model-) spooraanwinst(en)... door spoorijzer
Vandaag om 07:50:56
Swalbenburg, N modulebaan door NS264
07 September 2025, 23:27:50
Wie heeft er ervaring met een baan in een inpandige garage in een app. gebouw? door Peter Kleton
07 September 2025, 22:46:42
Raadplaatje door grossraumwagen
07 September 2025, 22:16:21
Mooi weer om buiten te spelen door sncf231e
07 September 2025, 22:00:18
Ontwikkelingen bij de Selfkantbahn (1.000mm) door frederik19630
07 September 2025, 21:59:16
Modules van Kees Gorter (vervolg) door NS264
07 September 2025, 21:12:54
Wèhnich - Eén onbeduidend baantje op 1200 bij 1200mm door einte
07 September 2025, 19:38:57
Toon hier je (model)TRAM foto's. door Hans Reints
07 September 2025, 19:26:41
  

Auteur Topic: Mail by Rail  (gelezen 1148 keer)

Hans Reints

  • हार्दिक शुभ कामनाएँ مع أطيب التحيات
  • Offline Offline
  • Berichten: 12481
    • sleutelspoor
Mail by Rail
« Gepost op: 17 August 2011, 16:40:44 »
Dit wilde ik jullie toch niet onthouden,


From 1832 to 1967, railroads large and small kept mail moving through rain, snow and gloom of night. As America grew and expanded, so did the Railway Mail Service, an elite branch of the Post Office Department that oversaw every aspect of moving mail by train. Nowhere was this more crucial than in the western states, where it could take months to receive a letter from back east. As stage lines and the pony express gave way to the railroads, mail service became an important part of every passenger train. At the dawn of the 20th century, railroads began offering faster and finer trains, aimed at affluent travelers. Their fast schedules and limited stops made them an ideal way to speed mail, and a Railway Post Office (RPO) became a fixture of each consist. This continued into the streamline era, and from the beginning, Santa Fe's premiere Super Chief and El Capitan included a Railway Post Office car.
Owing to the volume of mail received, sorted and distributed between Chicago and Los Angeles, the Post Office assigned the biggest RPOs to the route, equipped with a 60' mail compartment. Since the full interior was only used for sorting mail, these were known as “full RPOs.”
Despite increasing competition from air and highway, in 1954 Santa Fe took delivery of 10 brand-new full RPOs from Budd. Built of gleaming stainless steel, cars #89-98 allowed the railroad to create a pool of RPOs especially for its streamliners, instead of assigning specific cars to each.
While the Super Chief carried an RPO in both directions, after 1956 the new Hi-Level El Capitan only handled an RPO on its eastbound trip (since most of the population and industry were still in the east, more mail moved eastward) and only for part of its run. A car was picked up at La Junta, Colorado, and forwarded to Kansas City. This was switched out and a new RPO added for the final leg of the trip to Chicago.
Not all of the mail carried on these important runs had to be sorted en route, so both trains routinely carried at least one baggage car in storage mail service. This was actually mail traveling in locked pouches for a single destination and bulk mail such as magazines, which would all be sorted for local delivery after arrival.
With the loss of railway mail contracts in 1967, Santa Fe sidelined all of the 89-class RPOs in 1968. Most were sold to Mexico, and worked there for several more years. 
For modelers who want to make their train as authentic as possible, Walthers new El Capitan includes a 63' Railway Post Office (#932-9730). Based on cars #89-98, built by Budd as Job #9607-135, the models feature a real metal finish to simulate the prototypes' stainless steel construction, clear “glass” (tinted glass was reserved for passengers) factory installed grab irons and much more. Matching 73' Baggage Cars (#932-9740) are also available separately to handle bulk mail too

bron:Walthers
Dit forum is net een lopend buffet, je neemt wat je lekker vindt en wat je niet lust laat je liggen.